Corridor Placement Review
Duration: 4–6 hours on site plus written report within five business days
Location: Gwangju metro and sites within 120 km by road
Who this is for
Operators who have already narrowed their miner choice to one or two models at 0.05 TH/s or higher and need confirmation that the unit will survive a full duty cycle in their actual room — not a generic rack diagram from the manufacturer.
What you receive
- Walk-through of intake and exhaust paths with smoke-pencil or tracer notes where safe
- Placement sketch showing rack positions, minimum aisle widths, and baffle recommendations
- Thermal risk summary: recirculation percentage estimate, hot-spot zones, filter change interval
- Acoustic reading at the property line if the site is residential or mixed-use
- Maintenance calendar tied to your dust load and seasonal humidity
What is not included
- Electrical load calculations beyond nameplate comparison to your breaker schedule
- Procurement or resale of hardware
- Installation labour — we mark positions; your electrician and rack crew execute
Process
- Brief — You send floor dimensions, ceiling height, existing duct photos, and target miner model.
- Bench reference — We pull our published thermal data for that model at rated hash and fan speed.
- Site visit — Technician arrives with manometer, infrared spot readings, and acoustic meter.
- Report — PDF with annotated photos, sketch, and a single recommended layout with one alternate if space is tight.
Provider
Senior field reviewer with six years of small-farm corridor work in Jeolla Province. Reports are reviewed by our Gwangju office before release.
Next step
Use the contact form to propose a visit date. We confirm within two business days and request photos of intake grilles and any existing exhaust fans.