Who this is for

Operators who have already narrowed their miner choice to one or two models at 0.05 TH/s or higher and need confirmation that the unit will survive a full duty cycle in their actual room — not a generic rack diagram from the manufacturer.

What you receive

  • Walk-through of intake and exhaust paths with smoke-pencil or tracer notes where safe
  • Placement sketch showing rack positions, minimum aisle widths, and baffle recommendations
  • Thermal risk summary: recirculation percentage estimate, hot-spot zones, filter change interval
  • Acoustic reading at the property line if the site is residential or mixed-use
  • Maintenance calendar tied to your dust load and seasonal humidity

What is not included

  • Electrical load calculations beyond nameplate comparison to your breaker schedule
  • Procurement or resale of hardware
  • Installation labour — we mark positions; your electrician and rack crew execute

Process

  1. Brief — You send floor dimensions, ceiling height, existing duct photos, and target miner model.
  2. Bench reference — We pull our published thermal data for that model at rated hash and fan speed.
  3. Site visit — Technician arrives with manometer, infrared spot readings, and acoustic meter.
  4. Report — PDF with annotated photos, sketch, and a single recommended layout with one alternate if space is tight.

Provider

Senior field reviewer with six years of small-farm corridor work in Jeolla Province. Reports are reviewed by our Gwangju office before release.

Next step

Use the contact form to propose a visit date. We confirm within two business days and request photos of intake grilles and any existing exhaust fans.