Use this page as a checklist before booking a survey — or after receiving our report, to compare your build against the thresholds we enforce on site.

Minimum aisle widths (clear, unobstructed)

Single aisle, intake front / exhaust rear

90 cm minimum between rack faces. 100 cm preferred if operators walk the aisle during filter changes while units run.

Back-to-back racks, shared hot aisle

120 cm hot aisle width before duct capture. If hot aisle opens to room air without duct, treat entire room as mixed — requires tracer test.

Side clearance to wall

20 cm minimum from exhaust face to wall. 30 cm if wall is uninsulated plaster shared with living space — radiant heat feedback raises effective recirculation.

Intake lane rules

  • Intake grille area ≥ 1.5× sum of miner intake face areas in that lane.
  • No exhaust opening within 1.5 m horizontal of intake grille unless baffle height ≥ 60 cm between them.
  • Window intakes require louvers and insect screen outside filter media — screen alone is not filter.

Exhaust capture

  • Duct connection preferred when more than two full-size units share a room under 40 m².
  • Roof passive vents count as exhaust only if tracer shows positive outward flow at operating duty — many fail in summer stack inversion.

Tracer thresholds we document

ReadingInterpretation
Exhaust stream bends < 15° toward intakeAcceptable at hashboard height
15°–30° bend toward intakeYellow zone — baffle or duct extension recommended
> 30° bend or visible ingestion at intakeRed zone — relocate rack or redesign exhaust before production

Filter service intervals (starting points)

EnvironmentInterval
Clean suburban garage30 days
Agricultural dust (grain, livestock nearby)14 days
Coastal salt aerosol21 days with corrosion check on grilles

Adjust after your dust test — we ship a small sample bag on placement reviews.

Acoustic reference

At residential property lines we document SPL at full fan unless client requests a night profile. Many Korean municipal guidelines reference 50 dB(A) at boundary for nighttime — we do not certify legal compliance but we mark readings on the sketch.

Ready for a measured plan?

These numbers are defaults. Your room may need tighter lanes or duct capture after tracer work.

Corridor placement review Book baseline survey